Chronolia®: Fast-Track with Concrete

To save time and improve the productivity of your worksites, Chronolia® is your best ally. It quickly develops high mechanical resistance and formworks can be removed 3-5 times faster than standard concrete!

 

High early strength concrete to gain time, reduce cost and improve quality

Chronolia’s high early strength gain and hardening properties allow contractors to benefit from more flexibility in construction planning, safer working conditions, early loading of the structures, and associated cost savings. Formworks can be removed 3-5 times faster than standard concrete, resulting in twice as many daily cycles.

Chronolia® mixes are rigorously tested and designed to deliver the same strength that an ordinary mix gains in 28 days, in either 48, 24, 15, 6 or even 4 hours.

Discover its benefits

 
  • Rapid High Strength

    Achieves high strength rapidly, without affecting normal placement procedures as design slump is maintained.

  • Faster Production

    Form work can be removed in 4 hours after it is batched (using 4H mix).

  • Easier Workability

    Combining two hours of workability and hydration growth, Chronolia® is easier to use in a variety of applications.

 

Applications

 
 
  • Airport Runways
  • Loading Docks
  • Highway Ramps and Road Repairs
  • Concrete Walls
  • Beams and Columns
  • Prefabricated Systems
  • Flat Work
  • Post-Tensioned Decks